References

References that demonstrate our expertise, experience, and successful project delivery in the fields of industrial energy, technological systems, and engineering.

  • LEK d.d. Ljubljana
  • LEK d.d. Sandoz
    Ljubljana
    Project documentation and reconstruction of the EMO TPV 16 steam boiler, LEK Mengeš 1998
    Project documentation and construction of a steam boiler plant, LEK Lendava 1999
    Reconstruction of the HENSCHEL steam boiler, LEK Lendava 2000
    Project documentation for a steam boiler plant, LEK Romania 2002
    Project documentation for a steam boiler plant, LEK Poland 2002
    Construction of a closed-loop cooling system, LEK Ljubljana 2003
    Construction of a closed-loop cooling system, LEK Lendava 2003
    Project documentation and construction of a steam boiler plant, LEK Prevalje 2004
    Construction of a closed-loop cooling system, LEK Prevalje 2004
    Construction of the secondary PPW system for Biosynthesis, LEK Mengeš 2004
    Installation of HLP 12t process equipment and piping, LEK Mengeš 2004
    Project documentation and construction of a compressor station, LEK Ljubljana 2005
    Construction of a hot water boiler plant, LEK Kranjska Gora 2004
    Project documentation and construction of a steam boiler plant fired by waste solvents, LEK Lendava 2005
    Project documentation and construction of a compressor station, LEK Mengeš 2006
    Project documentation and construction of a steam boiler plant, LEK Mengeš 2006
    Project documentation and construction of a waste solvent storage and distribution facility for the boiler plant, LEK Mengeš 2007
    Reconstruction of the waste solvent-fired steam boiler plant, LEK Mengeš 2007
    Installation of a cooling tower in the cooling system, LEK Ljubljana 2007
    Installation of a Regenerative Thermal Oxidizer (RTO2), LEK Ljubljana 2008
    Installation of a Pharmatec pure steam generator, LEK Ljubljana 2010
    Reconstruction of the pharmaceutical cooling station, LEK Ljubljana 2011
    Construction of a condensation unit for waste air treatment, LEK Mengeš 2011
    Connection of the Regenerative Thermal Oxidizer (RTO), LEK Mengeš 2011
    Construction of high-pressure steam pipelines and reconstruction of the condensate network, LEK Ljubljana 2011
    Installation of a Regenerative Thermal Oxidizer (RTO2), LEK Ljubljana 2012
    Construction of high-pressure steam pipelines and condensate network – VIJALE 2, LEK Ljubljana 2012
    Reconstruction of the low-temperature cooling station, LEK Ljubljana 2012
    Installation of a Regenerative Thermal Oxidizer (RTO), LEK Prevalje 2012
    Construction of a compressor station, LEK Ljubljana 2013
    Construction of an internal high-pressure gas pipeline, LEK Mengeš 2013
    Free cooling system installation at the cooling station, LEK Mengeš 2014
    Free cooling system installation at the cooling station, LEK Lendava 2014
    Free cooling system installation at the cooling station, LEK Ljubljana 2014
    Construction of a waste solvent-fired steam boiler plant, LEK Mengeš 2014
    Construction of steam piping systems in the new Building 67, LEK Mengeš 2014
    Construction of a free cooling system at the cooling station, LEK Lendava 2018
    Construction of a condensate return system for the hot water network, LEK Ljubljana 2019
    PZI project documentation for Phase 2 condensate collection 2020
    PZI project documentation for the relocation of RTO2, LEK Ljubljana 2020
    Replacement of the primary process water (PTV11) pipeline, LEK Mengeš 2020
    Reconstruction of the heating substation, Building 23, LEK Mengeš 2021
    Reconstruction of the heating substation and high-pressure steam pipeline, Building 39, LEK Mengeš 2021
    Expansion of the low-temperature cooling system capacity, LEK Ljubljana 2021
    Reconstruction of the cooling station in Building 12, LEK Mengeš 2021
    Replacement of the cooling tower, LEK Lendava 2022
    Reconstruction of the heating substation PI and KDZ, LEK Mengeš 2022
    Reconstruction of the cooling station, LEK Prevalje 2022
    Reconstruction of a 2 × 8,000 kg/h, 10 bar steam boiler plant, including replacement of burners, control cabinets, and electrical installations, LEK Lendava 2024
  • NOVARTIS d.o.o
  • NOVARTIS d.o.o.
    Ljubljana / Mengeš
    Mechanical installation works for the “Solid Glycol Medium” project, Ljubljana site 2023
    Preparation of detailed design documentation (PZI) for the “Cooling Tower Replacement” project and execution of the replacement, STE building, Ljubljana site 2023
    Mechanical installation works for the “Condensate Rationalization” project, Ljubljana site 2023
    Detailed design documentation (PZI) for the installation of a Regenerative Thermal Oxidizer (RTO3), including positioning and installation of mechanical systems, Ljubljana site 2024
    Preparation of design documentation in the PZR, PZI, and PID phases for the expansion of the cooling station, Mengeš site 2024
    Preparation of detailed design documentation (PZI) for the replacement of the chiller unit, TDI building, Ljubljana site 2025
    Detailed design and as-built documentation (PZI, PID) for the installation of a Regenerative Thermal Oxidizer (RTO), including positioning and installation of mechanical systems, Mengeš site 2025
    Project documentation and installation of a VIESSMANN electric steam boiler with a capacity of 8,000 kg/h at 10 bar, Mengeš site 2026
  • KOTO d.d. Ljubljana
  • KOTO d.d.
    Ljubljana
    Project documentation and construction of a steam boiler plant 1998
    Project documentation and construction of heating substations 2000
    Project documentation and installation of an additional steam boiler 2002
    Installation works for the “Fat Processing Facility” 2006
    Installation of a combined heat and power generation system 2006
    Installation works for the “Animal Fat Combustion” project 2007
    Installation of the ECO1 OMNICAL steam boiler, 12 t/h, 13 bar 2018
    Construction of a heated transport pipeline for fat transfer 2020
    Construction of a condensate waste heat recovery system 2020
    Supply and installation of a melting chamber for waste fats 2021
    Conceptual design documentation (IDP) for connecting new equipment to utility systems in K1 2021
    Conceptual design documentation (IDP) for waste heat recovery from vapours in K1 and K3 2021
    Detailed design documentation (PZI) for the steam and condensate system for connecting new destructors in K1 2022
    Reconstruction of the OMNICAL steam boiler, 15 t/h, 13 bar 2024
    Waste heat recovery from vapours in K1–K3 2024
    Reconstruction of the OMNICAL steam boiler 2024
    Reconstruction of the OMNICAL steam boiler, 15 t/h 2026
  • DS SMITH SLOVENIJA
  • DS SMITH
    Slovenia / Austria / Serbia
    Reconstruction of the Đuro Đaković S1000 steam boiler, Logatec site 1998
    Project documentation and construction of a closed condensate system, Logatec site 2002
    Project documentation and construction of a steam boiler plant, Logatec site 2005
    Reconstruction of the OMNICAL TPV 9 steam boiler, Brestanica site 2005
    Reconstruction of the thermal boiler feed water treatment system, Brestanica site 2006
    Construction of a new thermal boiler feed water treatment system, Brestanica site 2009
    Reconstruction and modernization of the steam boiler plant, Brestanica site 2012
    Replacement of the gas burner on a 10.0 t/h, 16 bar steam boiler, Logatec site 2015
    Supply and installation of an HKB steam boiler, 8,000 kg/h, 16 bar, Brestanica site 2016
    Project documentation and construction of a steam boiler plant with a thermal water treatment system (1,600 kg/h, 13 bar), including steam and condensate piping for the cardboard machine, Rakek site 2016
    Construction of a closed condensate system, Brestanica site 2018
    Inspection and preparation of documentation for the operating permit of the Đuro Đaković steam boiler, Logatec site 2022
    Supply and installation of a spiral heat exchanger for 12 bar steam / 90/70°C hot water, Brestanica site 2023
    Reconstruction of the process steam and condensate pipelines for the cardboard machine, Brestanica site 2024
    Supply and installation of a spiral heat exchanger for 12 bar steam / 90/70°C hot water, Brestanica site 2024
    Project documentation and installation of steam and condensate systems for the cardboard machine, Karlsdorf, Austria 2024
    Project documentation and construction of a steam boiler plant with a closed condensate return system (7,000 kg/h, 16 bar), including steam and condensate piping for the cardboard machine, Kruševac, Serbia 2024
  • JP ENERGETIKA
  • JP ENERGETIKA d.o.o.
    Ljubljana
    Project documentation for the installation of steam superheaters 1998
    Reconstruction of BKG steam boilers 2003
    Installation of a new steam boiler 2005
    Reconstruction of boiler systems 2007
    Improvement of process steam supply reliability 2020
    Replacement of the excess steam system 2024
  • ENOS
  • ENOS – Energetika d.o.o.
    Jesenice
    Project documentation and construction of a district heating boiler plant with a capacity of 2 × 10 MW + 1 × 5 MW, operating at 130/70°C 2003
    Preparation of DGD and PZI design documentation for the construction of a biomass heating system, including a 5 MW biomass boiler plant operating at 110/90°C 2024
    Mechanical installation works for a 5 MW biomass boiler plant operating at 110/90°C 2025
  • ŽITO GORENJKA
  • ŽITO GORENJKA d.d.
    Lesce
    Project documentation and construction of a steam boiler plant – Chocolate Production 2002
    Project documentation and construction of a steam boiler plant – Bakery 2003
    Connection of fat melting units to the energy system 2005
    Connection of a new chocolate production line to the energy and process systems 2005
    Project documentation and construction of a compressor station 2005
    Installation of double-wall stainless steel heated pipelines for chocolate distribution 2008
    Installation of double-wall stainless steel heated pipelines for chocolate distribution 2010
    Construction of a thermal energy station for the chocolate production facility 2012
    Installation of double-wall stainless steel heated pipelines for chocolate return 2019
  • PIVOVARNA UNION
  • PIVOVARNA UNION d.d.
    Ljubljana
    Reconstruction of Walther & Cie steam boilers 1998
    Sterile steam system 1999
    Steam pressure reducing bypass station 2011
    Hot water boiler plant, 2 × 10 MW 2014
    Construction of a 2 × 10 MW boiler plant 2016
    Pivovarna Laško Union modernization project 2026
  • PIVOVARNA LAŠKO UNION
  • PIVOVARNA LAŠKO UNION d.o.o.
    Laško
    Project documentation and conversion of a hot water boiler into a steam boiler with a capacity of 16 t/h, including relocation to the boiler plant 2026
  • LJUBLJANSKE MLEKARNE
  • LJUBLJANSKE MLEKARNE d.d. Reconstruction of the steam boiler plant, LM Kočevje 2003
    Reconstruction of the steam boiler plant, LM Maribor 2004
    Reconstruction of the steam boiler plant, Maribor production facility 2024
  • GEA
  • GEA d.d.
    Slovenska Bistrica
    Project documentation and construction of a 75 bar steam boiler plant 2000
    Project documentation and construction of a 13 bar steam boiler plant 2002
    Reconstruction of the Viessmann steam boiler, 4.0 t/h, 13 bar 2022
    Reconstruction of the GEKA KONUS steam boiler, 1.1 t/h, 70 bar 2022
  • LEPENKA
  • LEPENKA d.d.
    Tržič
    Conversion of the steam boiler to natural gas firing 2001
    Reconstruction of the steam boiler plant, Paloma Prevalje 2005
    Installation of the ECO I system 2007
    Reconstruction of the remote monitoring system, Paloma Prevalje 2008
    Reconstruction of the remote monitoring system, Lepenka Tržič 2009
  • MELANIM
  • MELAMIN d.d.
    Kočevje
    Project documentation for the construction of a thermal oil boiler plant 1998
    Refurbishment of the heavy fuel oil storage tank 2002
    Reconstruction of the Đuro Đaković steam boiler feed system 2002
    Reconstruction of the steam boiler with remote monitoring and control 2007
    Monitoring of process steam and fuel consumption 2008
    Reconstruction of the thermal water treatment system 2008
    13 t/h biomass-fired steam boiler plant 2013
    Connection of the ARTOS production line 2015
    Waste air treatment system 2016
    Construction of a new steel chimney, Ø1900 mm 2020
  • JUB
  • JUB d.d.
    Dol pri Ljubljani / Nova vas
    Connection of the pre-expander to the process utility systems 2000
    Steam and condensate piping installation for EPS 3 2007
    Supply and installation of a steam accumulator 2008
    Construction of a heating boiler plant with distribution network 2008
    Cooling water, condensate, steam, compressed air, and vacuum systems 2008
    Construction of a 2 MW steam boiler plant 2010
    4,000 kg/h biomass-fired steam boiler plant 2016
    Conversion of the steam boiler plant to LPG firing 2017
    Construction of an internal gas pipeline 2022
  • AQUAFIL SLOVENIJA (Julon)
  • AQUAFIL SLOVENIJA d.d.
    Ljubljana (Julon)
    Reconstruction of the steam boiler plant – Štore site 2001
    Reconstruction of the thermal oil boiler plant – Ljubljana site 2007
    Reconstruction of the mobile steam boiler plant 2007
    Expansion of the thermal oil system 2008
    Expansion of the thermal oil system 2011
    8 t/h steam pressure reducing station 2011
    Reconstruction of the 8 t/h steam pressure reducing station 2017
    0.9 bar low-pressure steam generation system 2020
    Interconnecting steam pipeline to improve system reliability 2020
    Connection of a new pyrolysis furnace 2022
    Well water supply system 2022
  • BIRRA PEJA SH.A.
  • BIRRA PEJA Sh.A.
    Peć, Kosovo
    Construction of a 13 t/h steam boiler plant 2008
    Steam and condensate distribution network 2008
    Steam and condensate energy substations 2008
  • RADENSKA
  • RADENSKA d.d.
    Radenci
    Construction of a steam boiler plant with a thermal water treatment system, 1 × 5 MW, 10 bar 2008
    Reconstruction of the EMO steam boiler, 6,500 kg/h, 10 bar 2025
  • GORIČANE
  • GORIČANE d.d.
    Goričane
    PGD and PZI design documentation, including construction supervision for a 25 t/h steam boiler plant 2014
    PZI design documentation for the installation of a LOOS ZFR steam boiler, 3,000 kg/h, 16 bar 2022
    Installation of a LOOS ZFR steam boiler, 3,000 kg/h, 16 bar 2024
  • ETA
  • ETA d.d.
    Kamnik
    Project documentation for the construction of a steam boiler plant with process utility distribution systems and heating for production facilities 2010
  • SWATYCOMET
  • SWATYCOMET d.o.o.
    Maribor
    Project documentation and construction of a steam boiler plant with a thermal water treatment system, 600 kg/h, 10 bar 2011
  • PIVKA
  • PIVKA d.d.
    Pivka
    Construction of a 4,000 kg/h, 10 bar steam boiler plant 2014
    Installation of a 200 kW heating boiler for biogas 2015
    Conversion of the steam boiler plant to LPG firing 2016
    Reconstruction of the thermal water treatment system 2020
  • CINKARNA CELJE
  • CINKARNA CELJE d.d.
    Celje
    Project documentation for the construction of a 25 + 16 t/h, 24 bar steam boiler plant 2016
    Construction of a steam boiler plant with a thermal water treatment system 2017
    Construction of a cooling plant for NETZSCH grinding mills 2018
  • HELIOS
  • HELIOS d.o.o.
    Količevo
    Construction of a 2,000 kg/h, 10 bar steam boiler plant 2017
    Construction of a 2 × 1.6 MW hot water boiler plant 2017
    Construction of a 2 × 3.5 MW thermal oil boiler plant 2018
    Reconstruction of the BONO 3.5 MW thermal oil boiler 2023
    Reconstruction of the Viessmann 1.6 MW heating boiler 2023
    Project documentation for the additional R90 reactor line 2024
  • INTERSOCKS
  • INTERSOCKS d.o.o.
    Kočevje
    Project documentation and construction of a 1,000 kg/h, 10 bar steam boiler plant 2018
  • EUROBOX
  • EUROBOX d.o.o.
    Cerknica
    Construction of a steam boiler plant with thermal and chemical water treatment, 4,000 kg/h, 13 bar 2018
    Construction of a 2,000 kg/h, 13 bar steam boiler plant, Trbovlje site 2020
    Reconstruction of the steam boiler plant and installation of a 1.0 t/h steam boiler 2024
  • PERUTNINA PTUJ
  • PERUTNINA PTUJ d.d.
    Ptuj
    Installation of a 2,000 kg/h, 8 bar steam boiler at the MI Zalog facility 2018
    Thermal and chemical water treatment with reverse osmosis at the Draženci facility 2019
    Construction of a 2 × 1,300 kg/h steam boiler plant with a CNG system, Srbac, Bosnia and Herzegovina 2024
    Continuation of the steam boiler plant construction, Srbac, Bosnia and Herzegovina 2025
  • MESNINE BOHINJA
  • MESNINE BOHINJA d.o.o.
    Bohinjska Bistrica
    Project documentation and installation of a 250 kg/h, 7 bar steam boiler 2018
  • ELAN
  • ELAN d.o.o.
    Begunje
    Construction of a hot water boiler plant, 1 × 850 kW + 1 × 650 kW 2018
    Construction of a 2 × 4.0 MW hot water boiler plant 2018
    Project documentation and installation of process temperature conditioning chambers 2020
  • MM KOLIČEVO
  • MM KOLIČEVO d.o.o.
    Količevo
    Conceptual design documentation (IDZ) for a 30 MW / 70 MW cogeneration plant 2012
    Natural gas pressure regulating station for a 60 t/h steam boiler 2015
    Project documentation for the replacement of a 50 t/h steam boiler 2021
    Construction of a 50 t/h steam boiler plant 2022
    Main steam pipeline, 60 t/h 2022
    Process utility distribution systems for the reconstruction of the cardboard machine 2023
    Steam cooling system for the steam turbine 2024
  • SILKEM
  • SILKEM d.o.o.
    Kidričevo
    Reconstruction of the EMO TPV16-1 steam boiler, 16 t/h, 20 bar 2017
    Reconstruction of the EMO TPV16-2 steam boiler, 16 t/h, 20 bar 2018
  • TERMOELEKTRARNA BRESTANICA
  • Termoelektrarna Brestanica d.o.o. Detailed design (PZI) and as-built (PID) documentation for the reconstruction of the boiler plant and heating system 2020
  • DOM DANICE VOGRINEC
  • Dom Danice Vogrinec
    Maribor
    Project documentation and installation of a 1,600 kg/h, 13 bar steam boiler, including a thermal boiler feed water treatment system 2020
  • KRKA
  • KRKA d.d.
    Novo mesto
    Supply and commissioning of a 2,500 kg/h, 6 bar steam boiler 2020
  • XELLA
  • Xella d.o.o.
    Kisovec
    Reconstruction of the thermal boiler feed water treatment system, 20 m³/h, 20 bar 2020
    Installation of the ECO1 EMO TPV steam boiler, 12 t/h, 16 bar 2020
    Reconstruction of the OMNICAL TPV steam boiler, 10 t/h, 16 bar 2022
    Reconstruction of the EMO steam boiler 2025
  • SCHAFERROLLS
  • SCHAFERROLLS d.o.o.
    Brnik
    Project documentation and construction of a steam boiler plant with a capacity of 500 kg/h, 10 bar 2020
    Construction of a heating boiler plant with a capacity of 2 × 150 kW, operating at 100/80°C 2024
    Project documentation and reconstruction of the steam boiler plant, including the installation of a 700 kg/h, 13 bar steam generator 2025
  • FENOLIT
  • FENOLIT d.d.
    Borovnica
    Project documentation and reconstruction of a 3,000 kg/h, 10 bar steam boiler plant 2020
    Reconstruction of the TPK BKG steam boiler, 5,000 kg/h, 12 bar 2022
    Installation of a chemical water treatment system (ion exchange and reverse osmosis) 2022
  • JUTEKS
  • JUTEKS d.o.o.
    Žalec
    Project documentation and construction of a cooling system with a total capacity of 2.1 MW 2020
  • MESARSTVO OBLAK
  • MESARSTVO OBLAK d.o.o. Construction of a steam boiler plant with a capacity of 1,100 kg/h, 8.5 bar 2021
  • MINERALKA
  • MINERALKA d.o.o.
    Cerknica
    Replacement of a 1,650 kg/h, 16 bar steam boiler 2021
  • MLINOTEST
  • MLINOTEST d.d.
    Ajdovščina
    Reconstruction of the heat substation, hot water distribution system, and refrigeration plant for new pasta production lines 2021
    Construction of a steam boiler plant for the Nova Gorica bakery 2024
    Domestic hot water preparation system at Mlinotest Ajdovščina 2024
  • KLINIKA GOLNIK
  • KLINIKA GOLNIK Detailed Design (PZI) documentation for the renovation of a 3,000 kW heating boiler plant 2021
    Construction of a 3,000 kW heating boiler plant 2022
  • DONIT TESNIT
  • DONIT TESNIT d.o.o. Installation of boiler plant equipment in accordance with the SIST EN 12953-6:2011 standard 2020
  • TOPLARNA ŽELEZNIKI
  • Toplarna Železniki d.o.o. Reconstruction of the KIV steam boiler, converting it from a wood chip-fired steam system to a hot water heating system 2021
  • DOMPLAN
  • DOMPLAN d.d.
    Kranj
    Detailed Design Permit (DGD) and Detailed Design (PZI) documentation for a 5 MW biomass heating system, Planina boiler plant 2024–2025
  • TOSAMA
  • TOSAMA d.o.o.
    Domžale
    Supply and installation of a new high-pressure steam boiler with an integrated economizer (ECO) 2025
  • SIJ ACRONI
  • SIJ ACRONI d.o.o. Construction of the CRNO steam boiler plant – Phase 1 2025
    Construction of the CRNO steam boiler plant – Phase 2 2026
LEK d.d. Sandoz
Ljubljana
Project documentation and reconstruction of the EMO TPV 16 steam boiler, LEK Mengeš 1998
Project documentation and construction of a steam boiler plant, LEK Lendava 1999
Reconstruction of the HENSCHEL steam boiler, LEK Lendava 2000
Project documentation for a steam boiler plant, LEK Romania 2002
Project documentation for a steam boiler plant, LEK Poland 2002
Construction of a closed-loop cooling system, LEK Ljubljana 2003
Construction of a closed-loop cooling system, LEK Lendava 2003
Project documentation and construction of a steam boiler plant, LEK Prevalje 2004
Construction of a closed-loop cooling system, LEK Prevalje 2004
Construction of the secondary PPW system for Biosynthesis, LEK Mengeš 2004
Installation of HLP 12t process equipment and piping, LEK Mengeš 2004
Project documentation and construction of a compressor station, LEK Ljubljana 2005
Construction of a hot water boiler plant, LEK Kranjska Gora 2004
Project documentation and construction of a steam boiler plant fired by waste solvents, LEK Lendava 2005
Project documentation and construction of a compressor station, LEK Mengeš 2006
Project documentation and construction of a steam boiler plant, LEK Mengeš 2006
Project documentation and construction of a waste solvent storage and distribution facility for the boiler plant, LEK Mengeš 2007
Reconstruction of the waste solvent-fired steam boiler plant, LEK Mengeš 2007
Installation of a cooling tower in the cooling system, LEK Ljubljana 2007
Installation of a Regenerative Thermal Oxidizer (RTO2), LEK Ljubljana 2008
Installation of a Pharmatec pure steam generator, LEK Ljubljana 2010
Reconstruction of the pharmaceutical cooling station, LEK Ljubljana 2011
Construction of a condensation unit for waste air treatment, LEK Mengeš 2011
Connection of the Regenerative Thermal Oxidizer (RTO), LEK Mengeš 2011
Construction of high-pressure steam pipelines and reconstruction of the condensate network, LEK Ljubljana 2011
Installation of a Regenerative Thermal Oxidizer (RTO2), LEK Ljubljana 2012
Construction of high-pressure steam pipelines and condensate network – VIJALE 2, LEK Ljubljana 2012
Reconstruction of the low-temperature cooling station, LEK Ljubljana 2012
Installation of a Regenerative Thermal Oxidizer (RTO), LEK Prevalje 2012
Construction of a compressor station, LEK Ljubljana 2013
Construction of an internal high-pressure gas pipeline, LEK Mengeš 2013
Free cooling system installation at the cooling station, LEK Mengeš 2014
Free cooling system installation at the cooling station, LEK Lendava 2014
Free cooling system installation at the cooling station, LEK Ljubljana 2014
Construction of a waste solvent-fired steam boiler plant, LEK Mengeš 2014
Construction of steam piping systems in the new Building 67, LEK Mengeš 2014
Construction of a free cooling system at the cooling station, LEK Lendava 2018
Construction of a condensate return system for the hot water network, LEK Ljubljana 2019
PZI project documentation for Phase 2 condensate collection 2020
PZI project documentation for the relocation of RTO2, LEK Ljubljana 2020
Replacement of the primary process water (PTV11) pipeline, LEK Mengeš 2020
Reconstruction of the heating substation, Building 23, LEK Mengeš 2021
Reconstruction of the heating substation and high-pressure steam pipeline, Building 39, LEK Mengeš 2021
Expansion of the low-temperature cooling system capacity, LEK Ljubljana 2021
Reconstruction of the cooling station in Building 12, LEK Mengeš 2021
Replacement of the cooling tower, LEK Lendava 2022
Reconstruction of the heating substation PI and KDZ, LEK Mengeš 2022
Reconstruction of the cooling station, LEK Prevalje 2022
Reconstruction of a 2 × 8,000 kg/h, 10 bar steam boiler plant, including replacement of burners, control cabinets, and electrical installations, LEK Lendava 2024
NOVARTIS d.o.o.
Ljubljana / Mengeš
Mechanical installation works for the “Solid Glycol Medium” project, Ljubljana site 2023
Preparation of detailed design documentation (PZI) for the “Cooling Tower Replacement” project and execution of the replacement, STE building, Ljubljana site 2023
Mechanical installation works for the “Condensate Rationalization” project, Ljubljana site 2023
Detailed design documentation (PZI) for the installation of a Regenerative Thermal Oxidizer (RTO3), including positioning and installation of mechanical systems, Ljubljana site 2024
Preparation of design documentation in the PZR, PZI, and PID phases for the expansion of the cooling station, Mengeš site 2024
Preparation of detailed design documentation (PZI) for the replacement of the chiller unit, TDI building, Ljubljana site 2025
Detailed design and as-built documentation (PZI, PID) for the installation of a Regenerative Thermal Oxidizer (RTO), including positioning and installation of mechanical systems, Mengeš site 2025
Project documentation and installation of a VIESSMANN electric steam boiler with a capacity of 8,000 kg/h at 10 bar, Mengeš site 2026
KOTO d.d.
Ljubljana
Project documentation and construction of a steam boiler plant 1998
Project documentation and construction of heating substations 2000
Project documentation and installation of an additional steam boiler 2002
Installation works for the “Fat Processing Facility” 2006
Installation of a combined heat and power generation system 2006
Installation works for the “Animal Fat Combustion” project 2007
Installation of the ECO1 OMNICAL steam boiler, 12 t/h, 13 bar 2018
Construction of a heated transport pipeline for fat transfer 2020
Construction of a condensate waste heat recovery system 2020
Supply and installation of a melting chamber for waste fats 2021
Conceptual design documentation (IDP) for connecting new equipment to utility systems in K1 2021
Conceptual design documentation (IDP) for waste heat recovery from vapours in K1 and K3 2021
Detailed design documentation (PZI) for the steam and condensate system for connecting new destructors in K1 2022
Reconstruction of the OMNICAL steam boiler, 15 t/h, 13 bar 2024
Waste heat recovery from vapours in K1–K3 2024
Reconstruction of the OMNICAL steam boiler 2024
Reconstruction of the OMNICAL steam boiler, 15 t/h 2026
DS SMITH
Slovenia / Austria / Serbia
Reconstruction of the Đuro Đaković S1000 steam boiler, Logatec site 1998
Project documentation and construction of a closed condensate system, Logatec site 2002
Project documentation and construction of a steam boiler plant, Logatec site 2005
Reconstruction of the OMNICAL TPV 9 steam boiler, Brestanica site 2005
Reconstruction of the thermal boiler feed water treatment system, Brestanica site 2006
Construction of a new thermal boiler feed water treatment system, Brestanica site 2009
Reconstruction and modernization of the steam boiler plant, Brestanica site 2012
Replacement of the gas burner on a 10.0 t/h, 16 bar steam boiler, Logatec site 2015
Supply and installation of an HKB steam boiler, 8,000 kg/h, 16 bar, Brestanica site 2016
Project documentation and construction of a steam boiler plant with a thermal water treatment system (1,600 kg/h, 13 bar), including steam and condensate piping for the cardboard machine, Rakek site 2016
Construction of a closed condensate system, Brestanica site 2018
Inspection and preparation of documentation for the operating permit of the Đuro Đaković steam boiler, Logatec site 2022
Supply and installation of a spiral heat exchanger for 12 bar steam / 90/70°C hot water, Brestanica site 2023
Reconstruction of the process steam and condensate pipelines for the cardboard machine, Brestanica site 2024
Supply and installation of a spiral heat exchanger for 12 bar steam / 90/70°C hot water, Brestanica site 2024
Project documentation and installation of steam and condensate systems for the cardboard machine, Karlsdorf, Austria 2024
Project documentation and construction of a steam boiler plant with a closed condensate return system (7,000 kg/h, 16 bar), including steam and condensate piping for the cardboard machine, Kruševac, Serbia 2024
JP ENERGETIKA d.o.o.
Ljubljana
Project documentation for the installation of steam superheaters 1998
Reconstruction of BKG steam boilers 2003
Installation of a new steam boiler 2005
Reconstruction of boiler systems 2007
Improvement of process steam supply reliability 2020
Replacement of the excess steam system 2024
ENOS – Energetika d.o.o.
Jesenice
Project documentation and construction of a district heating boiler plant with a capacity of 2 × 10 MW + 1 × 5 MW, operating at 130/70°C 2003
Preparation of DGD and PZI design documentation for the construction of a biomass heating system, including a 5 MW biomass boiler plant operating at 110/90°C 2024
Mechanical installation works for a 5 MW biomass boiler plant operating at 110/90°C 2025
ŽITO GORENJKA d.d.
Lesce
Project documentation and construction of a steam boiler plant – Chocolate Production 2002
Project documentation and construction of a steam boiler plant – Bakery 2003
Connection of fat melting units to the energy system 2005
Connection of a new chocolate production line to the energy and process systems 2005
Project documentation and construction of a compressor station 2005
Installation of double-wall stainless steel heated pipelines for chocolate distribution 2008
Installation of double-wall stainless steel heated pipelines for chocolate distribution 2010
Construction of a thermal energy station for the chocolate production facility 2012
Installation of double-wall stainless steel heated pipelines for chocolate return 2019
PIVOVARNA UNION d.d.
Ljubljana
Reconstruction of Walther & Cie steam boilers 1998
Sterile steam system 1999
Steam pressure reducing bypass station 2011
Hot water boiler plant, 2 × 10 MW 2014
Construction of a 2 × 10 MW boiler plant 2016
Pivovarna Laško Union modernization project 2026
PIVOVARNA LAŠKO UNION d.o.o.
Laško
Project documentation and conversion of a hot water boiler into a steam boiler with a capacity of 16 t/h, including relocation to the boiler plant 2026
LJUBLJANSKE MLEKARNE d.d. Reconstruction of the steam boiler plant, LM Kočevje 2003
Reconstruction of the steam boiler plant, LM Maribor 2004
Reconstruction of the steam boiler plant, Maribor production facility 2024
GEA d.d.
Slovenska Bistrica
Project documentation and construction of a 75 bar steam boiler plant 2000
Project documentation and construction of a 13 bar steam boiler plant 2002
Reconstruction of the Viessmann steam boiler, 4.0 t/h, 13 bar 2022
Reconstruction of the GEKA KONUS steam boiler, 1.1 t/h, 70 bar 2022
LEPENKA d.d.
Tržič
Conversion of the steam boiler to natural gas firing 2001
Reconstruction of the steam boiler plant, Paloma Prevalje 2005
Installation of the ECO I system 2007
Reconstruction of the remote monitoring system, Paloma Prevalje 2008
Reconstruction of the remote monitoring system, Lepenka Tržič 2009
MELAMIN d.d.
Kočevje
Project documentation for the construction of a thermal oil boiler plant 1998
Refurbishment of the heavy fuel oil storage tank 2002
Reconstruction of the Đuro Đaković steam boiler feed system 2002
Reconstruction of the steam boiler with remote monitoring and control 2007
Monitoring of process steam and fuel consumption 2008
Reconstruction of the thermal water treatment system 2008
13 t/h biomass-fired steam boiler plant 2013
Connection of the ARTOS production line 2015
Waste air treatment system 2016
Construction of a new steel chimney, Ø1900 mm 2020
JUB d.d.
Dol pri Ljubljani / Nova vas
Connection of the pre-expander to the process utility systems 2000
Steam and condensate piping installation for EPS 3 2007
Supply and installation of a steam accumulator 2008
Construction of a heating boiler plant with distribution network 2008
Cooling water, condensate, steam, compressed air, and vacuum systems 2008
Construction of a 2 MW steam boiler plant 2010
4,000 kg/h biomass-fired steam boiler plant 2016
Conversion of the steam boiler plant to LPG firing 2017
Construction of an internal gas pipeline 2022
AQUAFIL SLOVENIJA d.d.
Ljubljana (Julon)
Reconstruction of the steam boiler plant – Štore site 2001
Reconstruction of the thermal oil boiler plant – Ljubljana site 2007
Reconstruction of the mobile steam boiler plant 2007
Expansion of the thermal oil system 2008
Expansion of the thermal oil system 2011
8 t/h steam pressure reducing station 2011
Reconstruction of the 8 t/h steam pressure reducing station 2017
0.9 bar low-pressure steam generation system 2020
Interconnecting steam pipeline to improve system reliability 2020
Connection of a new pyrolysis furnace 2022
Well water supply system 2022
BIRRA PEJA Sh.A.
Peć, Kosovo
Construction of a 13 t/h steam boiler plant 2008
Steam and condensate distribution network 2008
Steam and condensate energy substations 2008
RADENSKA d.d.
Radenci
Construction of a steam boiler plant with a thermal water treatment system, 1 × 5 MW, 10 bar 2008
Reconstruction of the EMO steam boiler, 6,500 kg/h, 10 bar 2025
GORIČANE d.d.
Goričane
PGD and PZI design documentation, including construction supervision for a 25 t/h steam boiler plant 2014
PZI design documentation for the installation of a LOOS ZFR steam boiler, 3,000 kg/h, 16 bar 2022
Installation of a LOOS ZFR steam boiler, 3,000 kg/h, 16 bar 2024
ETA d.d.
Kamnik
Project documentation for the construction of a steam boiler plant with process utility distribution systems and heating for production facilities 2010
SWATYCOMET d.o.o.
Maribor
Project documentation and construction of a steam boiler plant with a thermal water treatment system, 600 kg/h, 10 bar 2011
PIVKA d.d.
Pivka
Construction of a 4,000 kg/h, 10 bar steam boiler plant 2014
Installation of a 200 kW heating boiler for biogas 2015
Conversion of the steam boiler plant to LPG firing 2016
Reconstruction of the thermal water treatment system 2020
CINKARNA CELJE d.d.
Celje
Project documentation for the construction of a 25 + 16 t/h, 24 bar steam boiler plant 2016
Construction of a steam boiler plant with a thermal water treatment system 2017
Construction of a cooling plant for NETZSCH grinding mills 2018
HELIOS d.o.o.
Količevo
Construction of a 2,000 kg/h, 10 bar steam boiler plant 2017
Construction of a 2 × 1.6 MW hot water boiler plant 2017
Construction of a 2 × 3.5 MW thermal oil boiler plant 2018
Reconstruction of the BONO 3.5 MW thermal oil boiler 2023
Reconstruction of the Viessmann 1.6 MW heating boiler 2023
Project documentation for the additional R90 reactor line 2024
INTERSOCKS d.o.o.
Kočevje
Project documentation and construction of a 1,000 kg/h, 10 bar steam boiler plant 2018
EUROBOX d.o.o.
Cerknica
Construction of a steam boiler plant with thermal and chemical water treatment, 4,000 kg/h, 13 bar 2018
Construction of a 2,000 kg/h, 13 bar steam boiler plant, Trbovlje site 2020
Reconstruction of the steam boiler plant and installation of a 1.0 t/h steam boiler 2024
PERUTNINA PTUJ d.d.
Ptuj
Installation of a 2,000 kg/h, 8 bar steam boiler at the MI Zalog facility 2018
Thermal and chemical water treatment with reverse osmosis at the Draženci facility 2019
Construction of a 2 × 1,300 kg/h steam boiler plant with a CNG system, Srbac, Bosnia and Herzegovina 2024
Continuation of the steam boiler plant construction, Srbac, Bosnia and Herzegovina 2025
MESNINE BOHINJA d.o.o.
Bohinjska Bistrica
Project documentation and installation of a 250 kg/h, 7 bar steam boiler 2018
ELAN d.o.o.
Begunje
Construction of a hot water boiler plant, 1 × 850 kW + 1 × 650 kW 2018
Construction of a 2 × 4.0 MW hot water boiler plant 2018
Project documentation and installation of process temperature conditioning chambers 2020
MM KOLIČEVO d.o.o.
Količevo
Conceptual design documentation (IDZ) for a 30 MW / 70 MW cogeneration plant 2012
Natural gas pressure regulating station for a 60 t/h steam boiler 2015
Project documentation for the replacement of a 50 t/h steam boiler 2021
Construction of a 50 t/h steam boiler plant 2022
Main steam pipeline, 60 t/h 2022
Process utility distribution systems for the reconstruction of the cardboard machine 2023
Steam cooling system for the steam turbine 2024
SILKEM d.o.o.
Kidričevo
Reconstruction of the EMO TPV16-1 steam boiler, 16 t/h, 20 bar 2017
Reconstruction of the EMO TPV16-2 steam boiler, 16 t/h, 20 bar 2018
Termoelektrarna Brestanica d.o.o. Detailed design (PZI) and as-built (PID) documentation for the reconstruction of the boiler plant and heating system 2020
Dom Danice Vogrinec
Maribor
Project documentation and installation of a 1,600 kg/h, 13 bar steam boiler, including a thermal boiler feed water treatment system 2020
KRKA d.d.
Novo mesto
Supply and commissioning of a 2,500 kg/h, 6 bar steam boiler 2020
Xella d.o.o.
Kisovec
Reconstruction of the thermal boiler feed water treatment system, 20 m³/h, 20 bar 2020
Installation of the ECO1 EMO TPV steam boiler, 12 t/h, 16 bar 2020
Reconstruction of the OMNICAL TPV steam boiler, 10 t/h, 16 bar 2022
Reconstruction of the EMO steam boiler 2025
SCHAFERROLLS d.o.o.
Brnik
Project documentation and construction of a steam boiler plant with a capacity of 500 kg/h, 10 bar 2020
Construction of a heating boiler plant with a capacity of 2 × 150 kW, operating at 100/80°C 2024
Project documentation and reconstruction of the steam boiler plant, including the installation of a 700 kg/h, 13 bar steam generator 2025
FENOLIT d.d.
Borovnica
Project documentation and reconstruction of a 3,000 kg/h, 10 bar steam boiler plant 2020
Reconstruction of the TPK BKG steam boiler, 5,000 kg/h, 12 bar 2022
Installation of a chemical water treatment system (ion exchange and reverse osmosis) 2022
JUTEKS d.o.o.
Žalec
Project documentation and construction of a cooling system with a total capacity of 2.1 MW 2020
MESARSTVO OBLAK d.o.o. Construction of a steam boiler plant with a capacity of 1,100 kg/h, 8.5 bar 2021
MINERALKA d.o.o.
Cerknica
Replacement of a 1,650 kg/h, 16 bar steam boiler 2021
MLINOTEST d.d.
Ajdovščina
Reconstruction of the heat substation, hot water distribution system, and refrigeration plant for new pasta production lines 2021
Construction of a steam boiler plant for the Nova Gorica bakery 2024
Domestic hot water preparation system at Mlinotest Ajdovščina 2024
KLINIKA GOLNIK Detailed Design (PZI) documentation for the renovation of a 3,000 kW heating boiler plant 2021
Construction of a 3,000 kW heating boiler plant 2022
DONIT TESNIT d.o.o. Installation of boiler plant equipment in accordance with the SIST EN 12953-6:2011 standard 2020
Toplarna Železniki d.o.o. Reconstruction of the KIV steam boiler, converting it from a wood chip-fired steam system to a hot water heating system 2021
DOMPLAN d.d.
Kranj
Detailed Design Permit (DGD) and Detailed Design (PZI) documentation for a 5 MW biomass heating system, Planina boiler plant 2024–2025
TOSAMA d.o.o.
Domžale
Supply and installation of a new high-pressure steam boiler with an integrated economizer (ECO) 2025
SIJ ACRONI d.o.o. Construction of the CRNO steam boiler plant – Phase 1 2025
Construction of the CRNO steam boiler plant – Phase 2 2026